Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Perform a Dry run to get a preview of the cleanup before the scheduled cleanup will start. This is useful if you are creating a new schedule, and want to control understand what users are affected by the cleanup.

  1. Goto Scheduling and cleanup.

  2. Open the schedule you want to test. Make adjustments if needed.

  3. Scroll to the bottom of the screene screen and Save changes.

  4. Then click the button Dry Run.

  5. You will be notified with a link: Goto results when finished Go to results to monitor the cleanup.

    Skjermbilde 2024-08-19 kl. 12.27.07.pngImage Removedbilde-20240828-080145.pngImage Added

  6. Follow the link. The User screen opens with result of the Dry run loaded:
    BILDE

    bilde-20240828-080701.pngImage Added