Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. Goto Scheduling and cleanup.

  2. Open the schedule you want to test. Make adjustments if needed.

  3. Scroll to the bottom of the screen and Save changes.

  4. Then click the button Dry Run.

  5. You will be notified with a link: Go to results to monitor the cleanup.

    bilde-20240828-080145.png

  6. Follow the link. The User screen opens with result of the Dry run loaded.:

    bilde-20240828-080701.pngImage Added